Panel and service work
Panel replacement
Service power increase
A heavy-up increases available capacity for planned loads such as an EV charger, an addition, or new electric appliances. It can involve meter equipment, service wiring, grounding, and utility coordination.
Subpanel installation
Bring circuit distribution closer to an addition or workshop. The subpanel draws from your existing electrical service.
Plan for the loads you’ll actually use.
From first call to written quote
1. Share your project
Send the project address, photos of the panel and meter with electrical covers in place, and a list of equipment you plan to add.
2. Review the details
We review the equipment and your plans. A site evaluation or load calculation may be needed.
3. Get a defined scope
Your written quote defines the electrical work, any planned outage or utility coordination, and applicable permit administration.
Common questions
Will my power need to be off?
How do I know whether I need a heavy-up?
We review your existing service size and expected loads. A load calculation can help determine whether the planned equipment fits within your current capacity.

